type
sm-banner
background-image
crop-left
19%
background-color
navy
title

Treasury issues Notice 2024-41 for IRA domestic content bonus credit rules

subtitle
The guidance provides a new safe harbor for the domestic content bonus credit
date
May 22, 2024
text-color
light
gradient-overlay
dark
breadcrumb

Home

Insights

Tax regulatory resources

2024

  • Tax policy
  • Supply chain
  • Credits & incentives
  • Business tax
  • Energy
  • Manufacturing
  • Automotive
  • Real estate
  • Construction
  • Private equity

Executive summary: The IRS provides further guidance on the domestic content bonus credit for taxpayers claiming an energy credit under sections 45, 45Y, 48 or 48E.

On May 16, 2024, the Department of the Treasury (Treasury) and the Internal Revenue Service released Notice 2024-41 modifying section 3.03(2)(b) and (c) and section 3.04 of Notice 2023-38 and created a new safe harbor (“New Elective Safe Harbor”) taxpayers may elect to use to qualify for the domestic content bonus credit.   Taxpayers may rely on Notice 2023-38, as modified by Notice 2024-41, for any Applicable Project the construction of which begins before the date that is 90 days after the date any proposed regulations are published. Taxpayers may rely on the New Elective Safe Harbor for any Applicable Project the construction of which begins before the date that is 90 days after any future modification, update or withdrawal of the New Elective Safe Harbor. All defined terms used in this article have the same meaning as that used in Notice 2023-38 or Notice 2024-41.

Background

The Inflation Reduction Act (IRA) amended sections 45 and 48, and added new sections 45Y and 48E, permitting taxpayers to claim a domestic content bonus credit up to 10% or 10 percentage points depending on the credit claimed and if certain prevailing wage and apprenticeship requirements are met.

Generally, to satisfy the domestic content requirement, all steel or iron used in a structural function and not less than the adjusted percentage of the total costs of all such manufactured products in an Applicable Project must be mined, produced or manufactured in the United States. For an Applicable Project, the construction of which begins before 2025, the adjusted percentage is 40%, or 20% for offshore wind facilities. The adjusted percentage subsequently increases to 55% for qualified facilities that begun construction after 2026 and offshore wind facilities that begun construction after 2027.

On May 12, 2023, Treasury and the IRS issued Notice 2023-38, which provided details on both the Steel or Iron Requirement and the Manufactured Product Requirement. Section 3.04 of the Notice provided a safe harbor for categorizing certain Applicable Project Components as subject to either the Steel or Iron Requirement or the Manufactured Product Requirement. This safe harbor was limited to Applicable Project Components found in utility-scale photovoltaic systems, land-based and offshore wind facilities, and battery energy storage technologies. See RSM's prior article.

Notice 2024-41

The IRS made three key changes to section 3.04 of Notice 2023-38:

Notice 2024-41 also provided the New Elective Safe Harbor that taxpayers may use to classify Applicable Project Components and to calculate the Domestic Cost Percentage of an Applicable Project.

New Elective Safe Harbor

Under the New Elective Safe Harbor, taxpayers are still required:

However, instead of utilizing the manufacturer’s direct costs in calculating the Domestic Manufactured Products and Components Costs, the Total Manufactured Products Costs, and ultimately the Adjusted Percentage Rule, taxpayers can elect to use the classifications and cost percentages in the New Elective Safe Harbor.

Taxpayers who elect to use the New Elective Safe Harbor for any Applicable Project must use the classifications and cost percentages provided and may not use a different method or substitute any cost percentages. To meet the New Elective Safe Harbor, taxpayers must complete the following steps in addition to what is required under Notice 2023-38:

To be eligible for the New Elective Safe Harbor, Applicable Projects are not required to include the full list of Applicable Project Components provided in Table 1 of Notice 2024-41. Conversely an Applicable Project Component or Manufactured Product Component contained in a taxpayer’s Applicable Project but not listed in Table 1 will not disqualify the taxpayer from using the New Elective Safe Harbor. Special rules, do however, apply under both scenarios that the taxpayer must consider when calculating the Domestic Cost Percentage.

Notice 2024-41 provides several helpful examples applying the New Elective Safe Harbor. Treasury has requested comments to Notice 2024-41 by July 15, 2024. Treasury and IRS also indicated their intent to consider comments received on other sections of Notice 2023-38 in the context of forthcoming proposed regulations or any further guidance regarding the domestic content bonus requirements.

Washington National Tax takeaways

Notice 2024-41 was announced along with other Administrative provisions to support the domestic solar manufacturing industry including implementing certain trade policies regarding imported solar panels and announcing Department of Energy research and development funding selections for developing new technologies across the solar supply chain.

Notice 2024-41 reflects the administration’s goal to strengthen the county’s domestic solar supply chain and provides a concrete safe harbor to taxpayers who own solar, as well as land-based wind, and battery electric storage systems in calculating the Domestic Cost Percentage. Some key observations are as follows:

For more information, please consult with your RSM US tax advisor.